SJOG – Mt Lawley Campus
Aquatic Developments were engaged to provide extensive renovation and modelling works to the SJOG Mt Lawley Campus hydrotherapy pool.
Careful planning and coordination was required to avoid operational and patient disruption as works were undertaken in a “Live” hospital environment.
The pool was stripped, sections of failed concrete removed and replaced.
New tiling throughout the structure including replacing the perimeter overflow gutter system.
A commercial variable speed; dual turbine resistance swim system was installed as part of the facility update.
Replacement concourse tiling, an Aquatic Lift, robotic cleaner and tiling works to the existing sanitation facilities was included in our scope of works.